861 Rutherford Fischer, TX 78623
3 Beds
3 Baths
2,182 SqFt
UPDATED:
Key Details
Property Type Single Family Home
Sub Type Single Family Residence
Listing Status Active
Purchase Type For Sale
Square Footage 2,182 sqft
Price per Sqft $251
Subdivision Legends Rancho Del Lago 2
MLS Listing ID 557397
Style Hill Country
Bedrooms 3
Full Baths 2
Half Baths 1
Construction Status Resale
HOA Fees $300/ann
HOA Y/N Yes
Year Built 2019
Lot Size 1.030 Acres
Acres 1.03
Property Sub-Type Single Family Residence
Property Description
Built in 2019, this single family residence has a private tree lined driveway that leads you to the perfect hill country style home. Approx. 2182 sq/ft, LOW HOA fee of $250 Annually, Exterior GREENHOUSE, additional Metal STORAGE building, Composite DECKING w/above ground POOL built in 2023, and designated PAD SITE area w/septic connection. Unique pass through garage with circular drive makes entering and exiting a breeze. This properties wide open and easy flowing floor plan has plenty of interior space too. Open kitchen with granite countertops, all vinyl flooring throughout the home(no carpet), and the beautiful white plantation shutters add a finished touch to each room. Schedule a tour today or ask listing agent about the upcoming Open House! Buyers to verify all room measurements and HOA restrictions.
Location
State TX
County Comal
Interior
Interior Features Ceiling Fan(s), Double Vanity, Jetted Tub, Living/Dining Room, Recessed Lighting, Separate Shower, Natural Woodwork, Walk-In Closet(s), Window Treatments, Breakfast Bar, Granite Counters, Kitchen Island, Kitchen/Family Room Combo, Pantry
Heating Electric
Cooling Electric, 1 Unit
Flooring Vinyl
Fireplaces Number 1
Fireplaces Type Family Room, Wood Burning
Equipment Satellite Dish
Fireplace Yes
Appliance Dishwasher, Electric Range, Multiple Water Heaters, Oven, Some Electric Appliances, Built-In Oven, Microwave
Laundry Electric Dryer Hookup, Inside, Laundry Tub, Sink
Exterior
Exterior Feature Covered Patio, Deck, Private Yard, Storage
Garage Spaces 1.0
Garage Description 1.0
Fence None
Pool Above Ground, None
Community Features None, Gated
Utilities Available Cable Available, Electricity Available, Phone Available, Trash Collection Private
View Y/N No
Water Access Desc Community/Coop
View None
Roof Type Composition,Shingle
Porch Covered, Deck, Patio
Building
Story 1
Entry Level One
Foundation Slab
Sewer Not Connected (at lot), Aerobic Septic, Public Sewer, Septic Tank
Water Community/Coop
Architectural Style Hill Country
Level or Stories One
Additional Building Greenhouse, Storage
Construction Status Resale
Schools
Elementary Schools Rebecca Creek
Middle Schools Mountain Valley Middle School
High Schools Canyon Lake High School
School District Comal Isd
Others
HOA Name The Legends Homeowners Association
Tax ID 115919
Security Features Gated Community
Acceptable Financing Cash, Conventional, FHA, VA Loan
Listing Terms Cash, Conventional, FHA, VA Loan

GET MORE INFORMATION
- Killeen Homes for Sale
- Homes For Sale in Temple, TX
- Homes For Sale in Copperas Cove, TX
- Homes For Sale in Belton, TX
- Homes For Sale in Salado, TX
- Homes For Sale in Lampasas, TX
- Homes For Sale in Harker Heights, TX
- Homes For Sale in Gatesville, TX
- Homes For Sale in Kempner, TX
- Homes For Sale in Nolanville, TX
- Home for Sale in Little River-Academy, TX
- Home for Sale in Morgan's Point Resort, TX